How Long Is the Installation Cycle of Space Capsule Houses?
In the modern rhythm of life that pursues "install-and-occupy-now," space capsule houses—also called space Home, capsule Home, and modular space pod—have entered public view with their modular form. But how long does this integrated building take from transportation to the site to being put into use? From factory prefabrication to on-site assembly, from foundation treatment to system debugging, the efficient installation hides the dual codes of architectural industrialization and technological innovation.
I. Prefabricated Production: Time Compression via Factory Smart Manufacturing
As a leading manufacturer, we leverage advanced factory production to cut down prefabrication time while ensuring precision—laying the foundation for fast installation.
1. Full-Process Integration Advantages
The core components of our space capsules undergo "7-in-1" prefabrication in the factory: structural frame welding, water and electricity pipeline embedding, insulation layer filling, and integrated internal and external decoration. Data from our production line shows that the standardized production of a single capsule (20㎡) takes only 72 hours—80% more efficient than traditional on-site construction. This integration eliminates redundant on-site work, directly shortening the overall project timeline.
2. Balance Between Precision and Efficiency
We use CNC machining equipment to ensure component errors are ≤1mm, with laser-cut metal plates and 3D-printed decorative parts produced simultaneously. Our German-invested factory adopts a robotic assembly line, capable of producing 12 capsule modules per day with a quality inspection pass rate of 99.8%. This precision not only guarantees seamless on-site assembly but also avoids rework caused by mismatches—saving valuable time.
II. On-Site Installation: Efficient "Building Block-Style" Operation
Our on-site installation process is designed for speed, with flexible solutions for different scenarios and clear, streamlined steps.
1. Rapid Response in Foundation Treatment
2. Modular Assembly Process (Filled with Logical Details)
Our assembly follows a 4-step streamlined workflow, tailored to maximize efficiency:
As verified in a scenic spot camp project: An 8-person team completed the installation of 10 capsules in just 3 days, with a daily installation efficiency of 3.3 capsules/day—setting a benchmark for on-site speed.

III. Scenario Differences: Cycle Comparison Across Applications
Our space capsule house adapts to diverse needs with tailored timelines, all faster than traditional buildings:
1. Quick-Install Projects for Tourist Scenic Spots
A popular camp in Yunnan adopted our "prefabricated capsule + landscape platform" solution. From transportation to opening, it took only 15 days—3 days for capsule installation, and the rest for platform construction and greening. This speed helped the camp seize the peak tourism season, increasing early revenue by 40%.
2. Urban Emergency Shelter Projects
During the anti-epidemic period in Wuhan, our space capsule-style isolation units took only 4 hours from unloading to power-on. The standardized interface design allowed 300 units to be networked within 72 hours, setting a record for emergency building speed—critical for timely disaster response.
3. High-End Custom Residences
Double-story custom capsules (with curved designs and smart home integration) have a longer installation cycle of 7-10 days, but this is still 60% shorter than traditional villa construction. Our R&D team optimizes custom components in advance, minimizing on-site adjustments.
IV. Technical Guarantee for Quick Occupancy
We don’t just focus on fast installation—we ensure "install-and-occupy-now" with three core guarantees:
1. Integrated System Pre-Commissioning
Before leaving the factory, each capsule undergoes "full-system joint testing": Air conditioning (cooling/heating), bathroom drainage, and smart control systems run continuously for 72 hours. On-site, only a power connection is needed to activate all functions—no extra debugging time.
2. Eco-Friendly Materials Meeting Immediate Occupancy Standards
We use formaldehyde-free water-based coatings and food-grade sealants. Testing by a third-party institute shows that the TVOC (total volatile organic compounds) content inside the capsule is <0.2mg/m³, far below the national standard (0.6mg/m³)—fully meeting the "immediate occupancy" requirement.
3. Smart Acceptance Tools
Our AR scanning equipment completes tests for capsule tightness and circuit safety in 10 minutes—5 times more efficient than manual acceptance. A recent project shortened its overall delivery time by 2 days by using this technology.
V. Restrictive Factors & Solutions
We proactively address challenges to maintain fast installation:
1. Practical Challenges
2. Efficiency Improvement Strategies
VI. Industry Standards & Future Trends
1. Standard Guarantee
China’s Modular Integrated Building Technology Code clearly requires: Single capsule installation time ≤8 hours, multi-capsule networking efficiency ≥2 capsules per person per day—standards we not only meet but exceed.
2. Technological Innovation
From desert starry sky camps to urban emergency sites, our space capsule house is reshaping architectural efficiency standards with "weekly delivery." 72 hours of factory smart manufacturing, 3 days of on-site assembly, and zero-wait occupancy are not just technical breakthroughs—they’re the ultimate pursuit of living freedom. After all, in an era where time is value, "fast completion" and "quality life" are not opposites, but the optimal solution from architectural industrialization. As a manufacturer, we’ll continue to innovate to make fast-install space pod and sustainable capsule home accessible to more people.